|
Post by unreal on Sept 3, 2011 17:07:33 GMT -7
I'm as far as I can go until I get more parts. Next step is damper and pin the crank, then I can put the steering rack back in. I have to get some z51 oil cooler lines also. Everything went back together nicely. Put in the c5r timing chain and new seals up front.
|
|
|
Post by unreal on Sept 6, 2011 13:59:18 GMT -7
Picked up my radiator, pulleys and damper.
|
|
|
Post by unreal on Sept 7, 2011 18:51:21 GMT -7
|
|
|
Post by unreal on Sept 18, 2011 7:57:57 GMT -7
Got the rack back in. Big props to Shawn@Lethal Racing for his assistance in this build. If anyone needs parts for an LS build I would go to him. I've never had a vendor go above and beyond like he has for me.
|
|
|
Post by unreal on Sept 29, 2011 13:18:37 GMT -7
Heads are still 3 weeks out. Atleast I have this for now to play with.
|
|
|
Post by 500hp406 on Sept 29, 2011 21:20:35 GMT -7
Heads are still 3 weeks out. Atleast I have this for now to play with. Well, talk to us, how does she run.....
|
|
|
Post by unreal on Sept 30, 2011 7:06:27 GMT -7
It has 45 miles on it. I'll let you know once we have some mileage. Drives great so far. Rides smooth, comfy, and quiet. Need to get all the mods on it so it can look decent.
So the person who bought my heads is claiming I sent him junk heads and wants his money back. I can never luck out. Says they were overheated and everything is junk. I didn't even remove them off my perfectly running car until he paid for them. He is trying to file a paypal complaint to get his money back. What a pain in the ass.
|
|
|
Post by unreal on Oct 14, 2011 10:03:18 GMT -7
New fuel rails and ID1000CC injectors on the way for the vette.
|
|
|
Post by unreal on Oct 20, 2011 12:15:34 GMT -7
Getting bored and tired of waiting to get the vette running. Mustang has been MIA for weeks so I'm thinking of maybe just a motor swap.
|
|
|
Post by unreal on Oct 24, 2011 6:25:57 GMT -7
Got passenger side deck cleaned up and head bolt holes tapped out. Pain in the ass. Will try to get the drivers side done tonight.
|
|
|
Post by unreal on Oct 24, 2011 12:11:18 GMT -7
One side all done.
|
|
|
Post by unreal on Oct 27, 2011 6:53:59 GMT -7
Heads may go on tonight. Hearing conflicting info on copper spraying them or install dry. Texas speed said to copper spray if your not 100% sure on the block prep. Next big hold up will be push rods but atleast I can get everything else on this weekend.
|
|
|
Post by unreal on Oct 28, 2011 6:44:51 GMT -7
One head on, one head to go. Still waiting on the 1000CC injectors to show up.
|
|
|
Post by 500hp406 on Oct 28, 2011 9:15:20 GMT -7
How does that equate to lbs per minute
|
|
|
Post by unreal on Oct 28, 2011 9:49:52 GMT -7
Drop a zero. 100lbs/min.
|
|